Stairwell, walls and soffit skimmed during a full replaster

Full house replastering Bath

Full house replastering in Bath

Every room re-plastered in one planned job, so the whole house is ready to decorate at once.

  • 15 years' experience
  • 300+ reviews across 3 sites
  • £10m public liability
  • 5-year warranty

A full replaster usually follows a rewire or a renovation. In a 1930s semi in Newbridge or a 1970s home in Odd Down, we can usually re-skim the whole house, often by airless spray. In a Georgian townhouse we survey room by room first, because some walls may be original lime plaster that should be repaired rather than covered. Either way you get one fixed price for the whole house.

What we do

Re-skim or back to brick

  • Full house re-skim

    The plaster underneath is sound, so every wall and ceiling gets a fresh skim.

  • Back to brick

    Old, blown or damp plaster taken off, then re-plastered from scratch.

  • Period houses

    Original lime plaster repaired where it should stay, with consent checked first on listed homes.

Prices

How much does full house replastering cost?

Every job is different, so we price it after a free visit. You get a fixed written quote within 48 hours, with nothing added later.

Free visit, fixed written quote

Send a photo for a rough idea first, then we visit and price it properly.

Get a free quote
How it works

How the job runs

  1. 01Survey every room

    We check which walls can be skimmed, which need more, and which are lime.

  2. 02One fixed price

    Room by room, in writing within 48 hours.

  3. 03Board, bond and skim

    Chases boarded and scrimmed, then the house skimmed.

  4. 04Walk-round and aftercare

    Snags fixed, house left clean, drying guide for your decorator.

  • Stairwell seen from below, walls and soffit skimmed
Recent work

A recent full re-skim (Fishponds, Bristol)

A 3-bed semi left with chases in every wall after a rewire. We boarded the chases, then airless-spray skimmed the whole house, about 280m², in two days. The family stayed elsewhere for three days while it dried.

See more plastering in the gallery ›

Questions

Full house replastering questions

How long does a full house take?

With airless spray, a 3-bed can be skimmed in one or two days, plus 3 to 7 days drying. By hand it is usually four to six days. Period houses with lime repairs take longer.

Can we live in the house?

For a full house we recommend staying elsewhere for two or three days while the plaster dries.

Do I need consent?

If the house is listed, re-plastering can need Listed Building Consent. We tell you at the survey, before any work starts.

In Bristol? See full house replastering in Bristol.

Coverage

Plastering across Bath

The Bath neighbourhoods we cover, each with its own plastering page.

Free site visits across the BA postcodes. Listed Building Consent and conservation area approval are checked before we start.

Bristol & Bath

Get a fixed written quote for your project

Free site visit across Bristol and Bath, a fixed written quote within 48 hours, and no pressure either way.

WhatsApp

Step 1 of 5

What needs doing?

Pick the closest. You can tell us more at the end.