
Full house replastering Bristol
Full house replastering in Bristol
Every room re-plastered in one planned job, so the whole house is ready to decorate at once.
- 15 years' experience
- 300+ reviews across 3 sites
- £10m public liability
- 5-year warranty
A full house replaster usually follows a rewire, a replumb or a renovation, when every wall and ceiling is left with chases and patches. Where the old plaster is sound we re-skim the whole house, often by airless spray, which can finish a 3-bed in one or two days. Where it has blown or failed, we take it back to brick and re-plaster. Either way you get one fixed price for the whole house.
Re-skim or back to brick
Full house re-skim
The plaster underneath is sound, so every wall and ceiling gets a fresh skim. Quicker, less mess, lower cost.
Back to brick
Old, blown or damp plaster taken off, then re-plastered from scratch with bonding and a skim coat.
Airless spray
For big jobs: a whole 3-bed can be skimmed in one or two days instead of four to six by hand.
How much does full house replastering cost?
Every job is different, so we price it after a free visit. You get a fixed written quote within 48 hours, with nothing added later.
Free visit, fixed written quote
Send a photo for a rough idea first, then we visit and price it properly.
Get a free quoteHow the job runs
01Survey every room
We check which walls can be skimmed and which need more.
02One fixed price
Room by room, in writing within 48 hours.
03Board, bond and skim
Chases boarded and scrimmed, then the house skimmed, often by airless spray.
04Walk-round and aftercare
Snags fixed, house left clean, drying guide for your decorator.
Full re-skim after a rewire, Fishponds
A 3-bed semi in Fishponds left with chases in every wall after a rewire. We boarded the chases, then airless-spray skimmed the whole house, about 280m², in two days. The family stayed elsewhere for three days while it dried.
Full house replastering questions
How long does a full house take?
With airless spray, a 3-bed can be skimmed in one or two days, plus 3 to 7 days drying. By hand it is usually four to six days.
Can we live in the house?
For a full house we recommend staying elsewhere for two or three days while the plaster dries. There is no smell, but the house needs to be kept warm and ventilated.
When can we decorate?
Usually after about 7 days, longer in winter. Your decorator gets our written drying guide.
In Bath? See full house replastering in Bath.
Plastering across Bristol
Every Bristol neighbourhood we cover, each with its own plastering page.
Free site visits within 10 miles of BS15. Properties outside our standard coverage area can be quoted by arrangement.

